Next: Hardware
Up: l1uk_0123_swplans
Previous: Run Controllers (3)
Slide from last meeting...
A rough outline of tasks required for the slice tests
was discussed at our recent UK software meeting.
Some names have been pencilled in...
- Test vectors: Bill
- Readout and related stuff: Bruce
- Run control: Murrough
- Database: Murrough
- Histo displays: Norman/Steve
- Monitoring (readout out): Bruce
- Monitoring (user end): Steve (and Bill?)
- Event Dump: Steve
- Calibration: ?
The assumption was that Cornelius would be available for
maintaining and developing HDMC (with input from Bruce).
Not sure who will maintain HDMC in future...
Next: Hardware
Up: l1uk_0123_swplans
Previous: Run Controllers (3)
Murrough Landon (m.p.j.landon@qmul.ac.uk)