Next: Software Documents (2)
Up: l1joint_0628_docs
Previous: Documents and Software Process
Requirements Document
- Status: unfinished (1999)
- Ought to form the basis of the whole software project
- Needs a major rewrite in the light to developments
over the past couple of years
- Procedure: rewrite, circulate, discuss, amend,
(iterate?), review, update, publish in EDMS
- Priority: high
Run Control
- Status: draft, fairly complete?
- Informal description of the requirements and scope
of the L1Calo run control package
- Detailed set of actions for each module at each
run control state transition
- Needs discussion and review
- Priority: medium
Murrough Landon (m.p.j.landon@qmul.ac.uk)