Next: Run Control (3)
Up: l1joint_0302_setup
Previous: Run Control (1)
State Transitions
- Recommendations from the Online group:
- Initial
Loaded: read database, establish network connections
- Loaded
Configured: configure hardware (run type
independent) and software (start threaads, processes)
- Configured
Running: run type dependent stuff
Use Case
- Boot the DAQ (with default run type)
- Move to Configured state
- Change run type to some kind of calibration
- Start, stop calibration run
- Change run type back to Physics
- Start normal run
Murrough Landon (m.p.j.landon@qmul.ac.uk)