Next: TDAQ Parallel Sessions (1)
Up: l1uk_1201_tdaq
Previous: l1uk_1201_tdaq
Murrough Landon - 1 December 2000
http://www.hep.ph.qmw.ac.uk/~landon/talks
Summary of Trigger DAQ Workshop
- TDAQ Integration plans
- ROS and dataflow
- Online Software
- DCS
- Private discussions
- Mailing lists
Integration Plans
- Phase 1: basic level 2, dataflow and DCS bricolage
- Phase 2a: better designed and expanded version of phase 1
- Phase 2b,c: integrate subdetectors, level 1, test beam
- Test beds on various scales required
- Assumes TDR can be put back to summer/autumn 2002
Murrough Landon (m.p.j.landon@qmw.ac.uk)