Next: Required Software (5)
Up: l1soft_1102_daqplan
Previous: Required Software (3)
Calibration Programs
- Require setup code in the Run Controller.
- Monitoring programs to analyse the events and create new
database files.
- Q: how to control the trigger? Special run controller?
Test Vectors
- Programs to generate test vectors for various checks:
- Readout of PPM/CPM/JEM/CMMs to RODs
- PPM to CPM/JEM connectivity
- CP and JEP crate backplane connectivity (CPM-CPM,
JEM-JEM, CPM-CMM, etc).
- Ditto for timing setup
- So far we have imitation CPM data (to be loaded into DSS)
to check ROD behaviour.
Next: Required Software (5)
Up: l1soft_1102_daqplan
Previous: Required Software (3)
Murrough Landon (m.p.j.landon@qmw.ac.uk)