DAQ -1 and Level 2
Plans are well advanced to integrate level 2 into DAQ/EF -1 at
both hardware and software level by summer 2001.
Level 1
We are invited to draw up our own plans for integration....
From the adhoc report:
Phase 1 1. The LVL1 calo ROD and muon ROD (MIROD) must be integrated with the LVL2 Region-of-Interest Builder. This integration will be performed first in standalone tests in late 2000 or early 2001. 2. At least one LVL1 ROD should be integrated with a ROB in standalone tests. This integration will be performed first in standalone tests in late 2000 or early 2001. Phase 2 1. Vertical slices of LVL1 calo and LVL1 muon trigger systems, including front-end electronics, should be integrated. This is an internal LVL1 integration that will occur during 2001. 2. Integration of one or more LVL1 RODs, and of ROD_BUSY and TTC modules, in the HLT/DAQ integrated prototype. 3. Integration of at least one vertical slice of LVL1 into the complete integrated prototype system, initially in the lab and then at a test beam using real detector signals. This integration should be performed in early 2002.