Meetings at CERN
DIG Meeting
0pt
0pt
0pt
- Level 2 studying the optimal organisation of FEs into RODs
(SCT, Pixels, LAr)
- Detector requirements document is out of date. Subdetectors
should look at it and send updates.
- DAQ group (Dave Francis) looking for input/encouragement for extending
DAQ-1 functionality into the ROD crate.
ROD Meeting
0pt
0pt
0pt
- Proposal to use BCRESET to reset errors (every few seconds? minutes?)
- ROD crate standard: VME 64ext. Proposal for a bulk order
of 9U crates if we can acheive as much commonality as possible, eg
power supply, backplanes, minimal monitoring/controls (use DCS).
Murrough Landon (m.p.j.landon@qmw.ac.uk)