Up: l1joint_1113_sw
Previous: Prototype DAQ System (2)
Collaboration across Level 1
- Request from Ralf Spiwoks and Christoph Schwick.
- Define configuration database for the level 1 trigger.
Including crates and modules, calibration data,
trigger menus.
- How does (re)loading the trigger fit into DAQ run
control states.
- Common software developments... test software, DAQ software.
Concurrent Projects
- Continue HDMC development
- Thinking about (and documenting) final DAQ system
- Development of DAQ system for prototypes
- Joint work with L1 Muons and CTP
Up: l1joint_1113_sw
Previous: Prototype DAQ System (2)
Murrough Landon (m.p.j.landon@qmw.ac.uk)