Latency



Current Critical Path (Jet/Et)



Component Cable to next
Furthest (which?) FE electronics 60m$\rightarrow$
Receivers (EM Barrel/Hadronic Sum) 1m?$\rightarrow$
Receiver stations 10m$\rightarrow$
PreProcessor Modules 7.5m$\rightarrow$
Jet/Energy Modules 2.5m$\rightarrow$
Energy Sum Merger Modules 2.5m$\rightarrow$
Central Trigger Processor )
TTC Distribution ) 8m$\rightarrow$
Critical (eg LAr) TTC Crates )
Longest TTC Fibres 80m$\rightarrow$FE



Total latency in TDR was 82.2 BC. This is 2.2 BC, ie 11m cable over the target.



Less Critical Paths