Proposed Layout
- Calorimeter Trigger upstairs
- Continuous row of centrally placed racks
- Receiver crates at the outer ends connecting to PreProcessor
and the Cluster and Jet/Et processors in the middle
- Muon Trigger downstairs
- RPC and TGC triggers either side of central gap?
- CTP and TTC downstairs?
Outstanding Issues
- Confirm holes in shielding wall with TC group. We want the
two 400mm holes to niveau 2 now
- Still need to confirm number, size and bending radius of
cables and communicate to TC group
- Choice of cable from TileCal (to Calo and Muon triggers)
still not made
- Receiver crate may require cable supports extending outside
the 1m deep racks
- Location of TGC electronics still not decided?
- What is the critical latency path? Maybe via Silicon Tracker
racks in USA15?